Risk Assessment And Method Statement for New Zealand
Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Risk Assessment And Method Statement
"I need a Risk Assessment and Method Statement for a 15-story building maintenance project in Auckland, specifically for window cleaning and facade repairs to be conducted between March-June 2025, with particular emphasis on working at height and public safety in a busy urban environment."
Your data doesn't train Genie's AI
You keep IP ownership of your information
1. Project Information: Details of the project, location, dates, and key contacts
2. Scope of Work: Detailed description of the work activities to be carried out
3. Responsible Persons: Names and roles of key personnel responsible for implementing and monitoring the RAMS
4. Risk Assessment: Identification of hazards, risk evaluation, and control measures for each work activity
5. Method Statement: Step-by-step description of how the work will be carried out safely
6. Equipment and Materials: List of equipment, tools, and materials to be used, including safety equipment
7. Personal Protective Equipment: Specific PPE requirements for different activities
8. Emergency Procedures: Emergency response plans, first aid arrangements, and emergency contact details
9. Training Requirements: Required qualifications, certifications, and training for personnel
10. Monitoring and Review: Procedures for monitoring compliance and reviewing the effectiveness of control measures
1. Environmental Controls: Required when work activities have potential environmental impacts
2. Noise Assessment: Required for activities involving high noise levels
3. Traffic Management: Required when work affects public roads or vehicle movements
4. Confined Space Procedures: Required for any work in confined spaces
5. Working at Height: Required for activities involving work at height
6. Hazardous Substances: Required when handling or storing hazardous materials
7. Public Protection: Required when work is conducted in public areas
8. Temporary Works: Required for temporary structures or installations
9. Night Work Procedures: Required for work conducted outside normal daylight hours
10. Weather Contingency: Required for weather-dependent activities
1. Risk Assessment Matrix: Detailed risk assessment scoring matrix and methodology
2. Site Layout Plans: Maps and drawings showing work areas, access points, and safety features
3. Equipment Certificates: Copies of current certification for equipment and machinery
4. Training Records: Copies of relevant training certificates and competency records
5. Safety Data Sheets: SDS for any hazardous substances being used
6. Emergency Contact List: Comprehensive list of emergency contacts and procedures
7. Permit Templates: Templates for any required work permits
8. Inspection Checklists: Daily/weekly safety inspection checklists
9. Toolbox Talk Templates: Templates for safety briefings and toolbox talks
10. Incident Report Forms: Templates for reporting accidents and incidents
Authors
Construction
Manufacturing
Mining
Infrastructure
Transportation
Energy
Telecommunications
Waste Management
Healthcare
Education
Retail
Hospitality
Agriculture
Forestry
Marine Operations
Health and Safety
Operations
Project Management
Risk Management
Compliance
Quality Assurance
Site Operations
Facilities Management
Environmental Health
Production
Maintenance
Engineering
Health and Safety Manager
Project Manager
Site Supervisor
Safety Officer
Risk Assessment Specialist
Operations Manager
Construction Manager
Compliance Officer
Environmental Health and Safety Coordinator
Quality Assurance Manager
Site Engineer
Production Manager
Maintenance Supervisor
Facility Manager
HSE Consultant
Find the exact document you need
Water Risk Assessment
A New Zealand-compliant assessment document that evaluates water-related risks and provides mitigation strategies in accordance with local regulations and standards.
Tree Surgeon Risk Assessment
A New Zealand-compliant risk assessment template for tree surgery operations, ensuring safety and regulatory compliance under NZ health and safety legislation.
Risk Assessment Health And Social Care
A New Zealand-compliant risk assessment framework for health and social care settings, addressing clinical and operational safety requirements.
Risk Assessment Form Project Management
A New Zealand-compliant Risk Assessment Form for systematic identification and management of project-related risks, aligned with local health and safety regulations.
Risk Assessment For Schools
A New Zealand-compliant risk assessment framework for schools, addressing safety and operational risks under local education and health & safety regulations.
Risk Assessment Chemistry
A New Zealand-compliant chemical risk assessment document for evaluating and managing workplace chemical hazards under NZ health and safety regulations.
Risk Analysis Form
A structured risk analysis document compliant with New Zealand health and safety legislation, designed for systematic workplace risk assessment and management.
Oxygen Risk Assessment Form
A New Zealand-compliant risk assessment form for evaluating and managing safety risks associated with oxygen systems and handling procedures.
Model Risk Assessment
A New Zealand-compliant document for assessing and documenting risks associated with business decision-making models, aligned with RBNZ and FMA requirements.
Laboratory Risk Assessment
A structured risk assessment document for laboratory operations that ensures compliance with New Zealand health and safety regulations while establishing comprehensive safety protocols and control measures.
Home Risk Assessment
A New Zealand-compliant assessment document for identifying and evaluating safety hazards and health risks in residential properties, including detailed recommendations for risk mitigation.
Hazard Risk Assessment
A systematic evaluation of workplace hazards and risks, required under New Zealand health and safety legislation, including risk analysis and control measures.
Health And Safety Assessment Form
A New Zealand-compliant Health and Safety Assessment Form for systematic workplace hazard identification and risk management under NZ Health and Safety at Work Act 2015.
Government Risk Assessment
A New Zealand public sector document for systematic assessment and management of government operational and strategic risks, aligned with local legislative requirements.
Face Risk Assessment
A New Zealand-compliant assessment framework for evaluating risks and privacy implications of facial recognition technology implementation.
Construction Risk Assessment Form
A New Zealand-compliant document for identifying and managing construction site risks under the Health and Safety at Work Act 2015.
Building Risk Assessment
A New Zealand-compliant legal document for assessing and documenting building-related risks, safety measures, and compliance requirements under NZ building and safety regulations.
Bribery And Corruption Risk Assessment
A structured assessment of organizational bribery and corruption risks under New Zealand's regulatory framework, with analysis and mitigation recommendations.
Area Risk Assessment
A structured assessment document for identifying and managing workplace risks in compliance with New Zealand health and safety regulations.
Site Visit Risk Assessment
A New Zealand-compliant risk assessment document for evaluating and managing safety hazards during site visits, aligned with local Health and Safety regulations.
Risk Self Assessment
A structured risk self assessment template compliant with New Zealand's health and safety legislation, designed for systematic workplace risk identification and management.
Pharmacy Risk Assessment
A New Zealand-compliant risk assessment framework for identifying and managing operational risks in pharmacy settings, aligned with local pharmaceutical and safety regulations.
Makeup Artist Risk Assessment
A New Zealand-compliant risk assessment template for makeup artists, outlining safety protocols and hazard management procedures under NZ health and safety regulations.
Forestry Risk Assessment
A New Zealand-compliant risk assessment document for forestry operations, evaluating operational, environmental, and safety risks with corresponding mitigation strategies.
Smoking Risk Assessment
A structured assessment document for managing smoking-related risks in New Zealand workplaces, ensuring compliance with local health and safety regulations.
Ppe Risk Assessment
A New Zealand-compliant workplace safety document that assesses risks and specifies requirements for personal protective equipment use and management.
Participant Risk Assessment
A New Zealand-compliant legal document for assessing and documenting risks associated with participant involvement in activities, aligned with the Health and Safety at Work Act 2015.
Machine Guarding Assessment
A technical safety assessment document for evaluating machine guarding systems and safety measures in New Zealand workplaces, ensuring compliance with local health and safety regulations.
Bar Risk Assessment
A New Zealand-compliant risk assessment template for identifying and managing operational risks in bar establishments, aligned with local health, safety, and alcohol service regulations.
Machine Guarding Risk Assessment
A technical safety assessment document for evaluating machine guarding risks and control measures under New Zealand workplace safety regulations.
Home Visit Risk Assessment
A New Zealand-compliant risk assessment framework for managing safety during professional home visits, aligned with local health and safety regulations.
Workstation Risk Assessment Form
A standardized form for assessing workstation-related health and safety risks in compliance with New Zealand workplace safety regulations.
Formal Hazard Assessment
A systematic workplace hazard identification and risk management document compliant with New Zealand's Health and Safety at Work Act 2015.
Risk Assessment And Management Plan
A New Zealand-compliant document that identifies, analyzes, and establishes management strategies for operational risks under the Health and Safety at Work Act 2015.
High Level Risk Assessment
A comprehensive risk assessment document compliant with New Zealand regulations, providing systematic evaluation and treatment recommendations for organizational risks.
Care Home Risk Assessment
A New Zealand-compliant risk assessment framework for care home facilities, addressing safety and operational risks in accordance with local healthcare regulations.
Workplace Assessment
A legal framework for conducting workplace assessments in New Zealand, ensuring compliance with local health and safety legislation while providing structured evaluation guidelines.
Employee Health Risk Assessment
A New Zealand-compliant framework for assessing and managing workplace health risks, aligned with the Health and Safety at Work Act 2015.
Asset Management Risk Assessment
A New Zealand-compliant risk assessment framework for asset management, incorporating regulatory requirements and risk mitigation strategies.
Display Screen Equipment Risk Assessment
A structured assessment tool for evaluating and managing display screen equipment risks in New Zealand workplaces, aligned with national health and safety regulations.
First Aid Needs Assessment
A New Zealand workplace health and safety document that evaluates and establishes organizational first aid requirements in compliance with local regulations.
Daily Risk Assessment
A New Zealand-compliant daily workplace risk assessment tool for identifying and controlling safety hazards in accordance with local health and safety regulations.
Working At Height Risk Assessment
A New Zealand-compliant safety document that evaluates and controls risks associated with working at height, meeting requirements under the Health and Safety at Work Act 2015.
Manual Handling Risk Assessment
A New Zealand-compliant workplace safety document that assesses and addresses risks associated with manual handling tasks, aligned with the Health and Safety at Work Act 2015.
Risk Management Assessment
A comprehensive risk evaluation and management document compliant with New Zealand regulations, designed to identify, assess, and provide mitigation strategies for organizational risks.
Office Risk Assessment
A legally mandated workplace safety assessment document under New Zealand law that identifies and addresses potential risks in office environments.
Construction Risk Assessment
A New Zealand-compliant document that evaluates and outlines construction project risks and control measures under local health and safety regulations.
Fire Risk Assessment
A technical evaluation of property fire risks and safety measures, compliant with New Zealand fire safety regulations and building codes.
Chemical Risk Assessment Form
A mandatory workplace safety document under New Zealand law for assessing and controlling chemical-related risks in accordance with Health and Safety at Work Act 2015 requirements.
Food Risk Assessment
A regulatory document under New Zealand's Food Act 2014 that assesses and manages food safety risks in business operations.
Occupational Therapy Risk Assessment
A New Zealand-compliant occupational therapy risk assessment tool for evaluating and documenting client-specific physical, environmental, and occupational risks.
Dynamic Risk Assessment Form
A New Zealand-compliant real-time risk evaluation tool for identifying, assessing, and managing workplace hazards and safety measures in accordance with local health and safety regulations.
Psychology Risk Assessment
A New Zealand workplace document for assessing and managing psychological risks and hazards in compliance with local health and safety regulations.
Food Defence Risk Assessment
A New Zealand-compliant assessment document evaluating food defense risks and security measures in food production facilities to prevent intentional adulteration.
Food Fraud Vulnerability Assessment
A systematic assessment document for identifying and mitigating food fraud risks in New Zealand food businesses, aligned with local regulatory requirements.
Warehouse Risk Assessment
A mandatory risk assessment document for warehouse operations in New Zealand, complying with Health and Safety at Work Act 2015, identifying and addressing workplace hazards and safety measures.
Third Party Risk Assessment
A structured assessment framework for evaluating third party risks under New Zealand law and regulations.
Travel Risk Assessment
A New Zealand-compliant assessment document that identifies, evaluates, and provides mitigation strategies for risks associated with business travel.
Stress Risk Assessment
A New Zealand-compliant workplace Stress Risk Assessment framework for identifying and managing occupational stress risks under NZ Health and Safety legislation.
Risk Assessment And Method Statement
A New Zealand-compliant document combining risk assessment and safe work methodologies under the Health and Safety at Work Act 2015.
Pregnancy Risk Assessment
A New Zealand-compliant workplace assessment document for identifying and managing risks to pregnant employees, as required by NZ health and safety legislation.
Pest Risk Assessment
A technical assessment document under New Zealand law that evaluates potential pest risks, their impacts, and recommended control measures for protecting the country's biosecurity.
Outdoor Risk Assessment
A New Zealand-compliant risk assessment document for evaluating and managing safety hazards in outdoor activities and environments.
Infection Control Risk Assessment
A New Zealand-compliant document for assessing and managing infection control risks during construction activities in healthcare settings.
Forklift Risk Assessment
A structured assessment document for evaluating and controlling forklift operation risks, compliant with New Zealand workplace safety regulations.
Food Safety Risk Assessment
A systematic evaluation of food safety hazards and control measures in accordance with New Zealand food safety regulations and standards.
First Aid Risk Assessment
A New Zealand workplace health and safety document that assesses risks and establishes first aid requirements in compliance with the Health and Safety at Work Act 2015.
Finance Risk Assessment
A structured financial risk evaluation document compliant with New Zealand regulations, assessing various financial risks and providing mitigation strategies.
Church Risk Assessment
A New Zealand-compliant risk assessment framework for churches, addressing safety and operational risks under NZ health and safety legislation.
Client Risk Assessment Form
A New Zealand-compliant form for assessing and documenting client risk levels in accordance with AML/CFT and other regulatory requirements.
Site Hazard Assessment Form
A standardized form for identifying and assessing workplace hazards in compliance with New Zealand health and safety regulations.
Job Site Hazard Assessment Form
A New Zealand-compliant workplace safety document used to identify, assess, and control job site hazards under the Health and Safety at Work Act 2015.
Life Safety Risk Assessment Form
A New Zealand-compliant form for assessing and documenting life safety risks in workplaces, aligned with local health and safety legislation.
Site Safety Assessment Form
A New Zealand-compliant form for conducting and documenting comprehensive workplace safety assessments, aligned with local health and safety regulations.
Hazard Identification And Risk Assessment Form
A New Zealand-compliant form for systematic workplace hazard identification and risk assessment, aligned with the Health and Safety at Work Act 2015.
Composite Risk Assessment Worksheet
A structured risk assessment tool compliant with New Zealand health and safety legislation for systematic workplace hazard identification and risk management.
Risk Management Form
A New Zealand-compliant risk management form for systematic identification, assessment, and control of workplace risks under NZ health and safety legislation.
Plant Risk Assessment Form
A New Zealand-compliant safety document for assessing and managing risks associated with plant and machinery operations under NZ health and safety legislation.
Filming Risk Assessment Form
A New Zealand-compliant risk assessment form for identifying and managing safety hazards in filming activities, aligned with local health and safety regulations.
Environmental Risk Assessment Form
A New Zealand-compliant form for assessing and managing environmental risks associated with projects or operations, aligned with local environmental legislation and requirements.
Ppe Hazard Assessment Form
A New Zealand-compliant workplace safety document for assessing hazards and determining appropriate PPE requirements in accordance with NZ health and safety regulations.
Job Safety Assessment Form
A structured safety assessment document used in New Zealand workplaces to identify, evaluate, and control job-specific risks in compliance with local health and safety regulations.
Health Risk Assessment Form
A New Zealand-compliant Health Risk Assessment Form for systematic evaluation of individual health risks, aligned with local health and safety regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it