Ƶ

Risk Assessment And Method Statement for India

Risk Assessment And Method Statement Template for India

Create a bespoke document in minutes, or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Risk Assessment And Method Statement

"I need a Risk Assessment and Method Statement for a 15-story residential building construction project in Mumbai, starting March 2025, with particular focus on working at height and crane operations."

Your data doesn't train Genie's AI

You keep IP ownership of your information

Generate a Bespoke Document

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Risk Assessment And Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Risk Assessment And Method Statement?

The Risk Assessment and Method Statement (RAMS) is a crucial document required under Indian safety regulations, particularly the Occupational Safety, Health and Working Conditions Code, 2020. It is essential for any high-risk or complex work activities where systematic hazard identification and risk control are necessary. The document serves dual purposes: first, as a detailed risk assessment tool identifying potential hazards and their control measures; and second, as a methodical statement outlining specific procedures for safe work execution. RAMS documents are mandatory for many industries in India and must be prepared before commencing any significant work activities. They need regular updates to reflect changing site conditions or work procedures and must align with both national and state-level safety requirements.

What sections should be included in a Risk Assessment And Method Statement?

1. Document Control Information: Contains document reference number, revision history, and approval status

2. Project Details: Specific information about the project, location, dates, and scope of work

3. Responsible Persons: Details of key personnel including project manager, safety officer, and supervisors

4. Work Description: Detailed description of the work to be carried out, including sequence of operations

5. Resource Requirements: List of personnel, equipment, materials, and tools required for the work

6. Risk Assessment Matrix: Standard risk assessment matrix showing likelihood and severity ratings

7. Hazard Identification: Comprehensive list of all potential hazards associated with the work

8. Risk Evaluation: Assessment of risks associated with each identified hazard

9. Control Measures: Detailed preventive and protective measures for each identified risk

10. Method Statement: Step-by-step procedure for carrying out the work safely

11. Emergency Procedures: Specific emergency response procedures and contact information

12. PPE Requirements: Detailed list of required Personal Protective Equipment

13. Training Requirements: Specific training and competency requirements for personnel

What sections are optional to include in a Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Required when work has significant environmental implications

2. Noise Assessment: Needed for works involving high noise levels or in noise-sensitive areas

3. Traffic Management Plan: Required for works affecting public roads or vehicle movements

4. Confined Space Entry Procedures: Necessary when work involves confined space operations

5. Working at Height Procedures: Required for any work conducted at height

6. Lifting Operations: Needed when crane or lifting operations are involved

7. Hazardous Substance Assessment: Required when handling dangerous or hazardous materials

8. Permit to Work Systems: Necessary for high-risk activities requiring specific authorization

What schedules should be included in a Risk Assessment And Method Statement?

1. Risk Assessment Forms: Blank and completed risk assessment forms for specific tasks

2. Equipment Inspection Checklists: Detailed checklists for equipment inspection and maintenance

3. Training Records: Copies of relevant training certificates and competency records

4. Site Layout Plans: Drawings showing work areas, access routes, and emergency exits

5. Emergency Contact Details: List of emergency contacts and first aiders

6. Toolbox Talk Records: Records of safety briefings and toolbox talks

7. Method Statement Briefing Record: Sign-off sheets for worker acknowledgment of RAMS

8. Incident Report Forms: Template forms for reporting accidents and incidents

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions








































Clauses




















Relevant Industries

Construction

Manufacturing

Mining

Oil and Gas

Chemical Processing

Infrastructure Development

Power Generation

Transportation

Telecommunications

Heavy Industry

Warehousing and Logistics

Healthcare Facilities

Waste Management

Marine Operations

Relevant Teams

Health and Safety

Operations

Project Management

Quality Assurance

Risk Management

Compliance

Engineering

Production

Maintenance

Environmental

Site Operations

Technical Services

Emergency Response

Training and Development

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Risk Assessment Specialist

Safety Officer

Operations Manager

Construction Manager

Compliance Officer

Quality Control Manager

Environmental Health Officer

Site Engineer

Production Manager

Maintenance Supervisor

Technical Director

HSE Coordinator

Industries







Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Pre Job Safety Assessment Form

A mandatory safety assessment document used in Indian workplaces to identify and control potential hazards before starting work activities, complying with Indian occupational safety regulations.

find out more

Infection Control Risk Assessment Form For (Construction)

A regulatory compliance document used in Indian healthcare facilities to assess and manage infection control risks during construction activities, aligned with national healthcare and building standards.

find out more

Industrial Risk Assessment

A regulatory-compliant risk assessment document under Indian law that identifies, analyzes, and provides mitigation strategies for industrial hazards and risks.

find out more

Hospital Safety Risk Assessment

A comprehensive safety risk assessment document for healthcare facilities in India, evaluating various safety aspects and providing risk mitigation recommendations.

find out more

Hospital Risk Assessment

A comprehensive hospital risk assessment document compliant with Indian healthcare regulations and NABH standards, designed to identify and mitigate healthcare facility risks.

find out more

Home Working Risk Assessment

An India-compliant risk assessment document for evaluating and managing health, safety, and security risks associated with remote working arrangements.

find out more

Home Risk Assessment Form

An Indian jurisdiction document for comprehensive residential property risk assessment, compliant with national building codes and safety regulations.

find out more

Eyewash Risk Assessment Form

An Indian workplace safety document for assessing eye hazards and eyewash facilities, ensuring compliance with The Factories Act, 1948 and state regulations.

find out more

Fire Risk Assessment Review

A comprehensive evaluation of fire safety measures and risks in accordance with Indian fire safety regulations, providing detailed recommendations for compliance and improvements.

find out more

Environment Of Care Risk Assessment

An environmental risk and safety assessment document for healthcare facilities in India, ensuring compliance with national environmental and healthcare facility standards.

find out more

Contractors Risk Assessment

A regulatory-compliant risk assessment document under Indian law for evaluating and managing contractor-related hazards and safety measures in construction and development projects.

find out more

Construction Fire Risk Assessment

A mandatory fire safety evaluation document for construction projects in India, ensuring compliance with national and state-level fire safety regulations.

find out more

Care Home Fire Risk Assessment

A mandatory fire safety assessment document for Indian care homes, ensuring compliance with national and state fire safety regulations while protecting vulnerable residents.

find out more

Task Based Risk Assessment

A comprehensive safety document that identifies, evaluates, and controls task-specific workplace risks, compliant with Indian safety regulations and standards.

find out more

Site Risk Assessment

A mandatory risk assessment document under Indian law that evaluates and documents site-specific hazards, safety measures, and compliance requirements.

find out more

Job Risk Assessment Form

A standardized form for workplace hazard identification and risk assessment, compliant with Indian safety regulations and labor codes.

find out more

First Aid Needs Assessment Form

An assessment form for evaluating workplace first aid requirements and ensuring compliance with Indian safety regulations and statutory requirements.

find out more

Water Risk Assessment

A detailed evaluation of water-related risks and mitigation strategies for operations in India, complying with national and state-level water regulations.

find out more

Model Risk Assessment

A regulatory-compliant framework for assessing model risks in Indian financial institutions, following RBI guidelines and Basel III standards.

find out more

Government Risk Assessment

An Indian government-compliant risk assessment document for analyzing and evaluating operational and strategic risks in public sector operations.

find out more

Construction Risk Assessment Form

An Indian regulatory-compliant form for assessing and managing construction site risks and safety measures under Indian construction safety laws.

find out more

Building Risk Assessment

A comprehensive evaluation of building-related risks and safety measures compliant with Indian construction and safety regulations.

find out more

Area Risk Assessment

A detailed risk evaluation document compliant with Indian safety and environmental regulations, analyzing potential hazards and providing mitigation recommendations for a specified area.

find out more

Pharmacy Risk Assessment

A regulatory-compliant risk assessment framework for pharmacies in India, evaluating operational, safety, and compliance risks while providing mitigation strategies.

find out more

Organisational Risk Assessment

A comprehensive risk assessment document that evaluates organizational risks and mitigation strategies in compliance with Indian regulatory requirements.

find out more

Makeup Artist Risk Assessment

An Indian law-compliant risk assessment template for makeup artists, outlining safety protocols and hazard mitigation strategies for cosmetic application services.

find out more

Forestry Risk Assessment

A detailed risk assessment document for forest-related activities in India, analyzing environmental, social, and regulatory risks while ensuring compliance with Indian forest legislation.

find out more

Risk Assessment Childcare

A comprehensive risk assessment template for Indian childcare facilities, ensuring compliance with national safety regulations and operational standards.

find out more

Smoking Risk Assessment

A risk assessment document for managing smoking-related hazards and ensuring compliance with Indian tobacco control and workplace safety regulations.

find out more

Plant And Equipment Risk Management Form

An Indian regulatory-compliant form for comprehensive risk assessment and management of industrial plant and equipment operations.

find out more

Ppe Risk Assessment

A structured assessment document for Personal Protective Equipment requirements and implementation, ensuring compliance with Indian workplace safety regulations.

find out more

Machine Guarding Assessment

A technical evaluation of industrial machine guarding systems' compliance and adequacy under Indian safety regulations and standards.

find out more

New And Expectant Mothers Risk Assessment

An Indian law-compliant risk assessment document for protecting pregnant employees and new mothers in the workplace, addressing various occupational hazards and necessary control measures.

find out more

Bar Risk Assessment

A comprehensive risk assessment framework for bar operations in India, incorporating state and national regulatory requirements for safety, hygiene, and alcohol service compliance.

find out more

Machine Guarding Risk Assessment

A technical safety assessment document evaluating machinery hazards and guarding requirements in accordance with Indian industrial safety regulations and the Factories Act 1948.

find out more

Field Level Hazard Assessment

A standardized safety assessment document used in Indian industrial operations to identify and mitigate workplace hazards, compliant with national safety regulations.

find out more

Home Visit Risk Assessment

An Indian jurisdiction-compliant risk assessment template for healthcare professionals conducting home visits, addressing safety, security, and healthcare delivery requirements.

find out more

Pre Job Hazard Assessment

A comprehensive hazard assessment and control document compliant with Indian safety regulations, used to identify and mitigate workplace risks before starting work activities.

find out more

Formal Hazard Assessment

A mandatory workplace hazard evaluation and risk assessment document compliant with Indian safety regulations and workplace safety laws.

find out more

Application Security Risk Assessment

An Indian law-governed agreement for conducting application security risk assessments, outlining testing scope, methodology, and compliance requirements.

find out more

Workstation Risk Assessment Form

A comprehensive workstation risk assessment tool compliant with Indian workplace safety regulations, designed to evaluate and document computer workstation safety and ergonomic conditions.

find out more

Financial Institution Risk Assessment

A comprehensive risk assessment framework for Indian financial institutions, aligned with RBI regulations and Basel guidelines, evaluating multiple risk categories and providing mitigation strategies.

find out more

General Risk Assessment Form

A standardized risk assessment document for identifying and managing workplace hazards in compliance with Indian safety regulations.

find out more

Project Risk Assessment

A comprehensive risk assessment and mitigation planning document compliant with Indian regulatory requirements, designed to identify and address project-related risks.

find out more

Risk Assessment And Management Plan

A comprehensive risk management framework document compliant with Indian regulations, outlining risk assessment, mitigation strategies, and monitoring procedures.

find out more

High Level Risk Assessment

A comprehensive risk evaluation document compliant with Indian regulatory requirements, providing systematic assessment and mitigation strategies for organizational risks.

find out more

Hazard Identification Form

A standardized form for identifying and documenting workplace hazards in compliance with Indian safety regulations and workplace safety requirements.

find out more

Occupied Building Risk Assessment

A comprehensive risk assessment document for occupied buildings in India, evaluating safety, structural, and operational risks under Indian regulatory requirements.

find out more

Care Home Risk Assessment

A structured risk assessment document for Indian care homes, ensuring compliance with national healthcare regulations while evaluating and managing facility-wide safety risks.

find out more

Workplace Assessment

A comprehensive workplace safety and compliance evaluation document aligned with Indian regulations, assessing various aspects of workplace conditions and providing improvement recommendations.

find out more

Factory Risk Assessment

A mandatory risk evaluation document under Indian law that identifies, assesses, and provides mitigation strategies for all potential hazards in factory operations.

find out more

Display Screen Assessment

An Indian regulation-compliant assessment document for evaluating workplace display screen equipment setup and associated health and safety factors.

find out more

Asset Management Risk Assessment

An Indian law-governed document establishing risk assessment framework for asset management activities, ensuring compliance with SEBI and RBI regulations.

find out more

Pre Construction Risk Assessment

A mandatory pre-construction risk evaluation and mitigation planning document compliant with Indian construction safety regulations and building codes.

find out more

Daily Risk Assessment

A comprehensive daily workplace safety assessment tool compliant with Indian safety regulations, used to identify, evaluate, and control workplace hazards.

find out more

Catering Risk Assessment

An India-compliant risk assessment document for catering operations, addressing food safety, operational hazards, and control measures under FSSAI regulations.

find out more

Working At Height Risk Assessment

An Indian regulation-compliant risk assessment document for managing safety risks associated with working at height activities, aligned with the Factories Act and construction safety requirements.

find out more

Hazard Vulnerability Assessment

A comprehensive hazard and vulnerability evaluation document compliant with Indian regulations, assessing potential risks and providing mitigation recommendations.

find out more

Manual Handling Risk Assessment

An Indian regulation-compliant risk assessment document for evaluating and controlling manual handling hazards in workplace operations.

find out more

Risk Management Assessment

A comprehensive risk evaluation document compliant with Indian regulations that identifies, analyzes, and provides mitigation strategies for organizational risks.

find out more

Office Risk Assessment

A mandatory workplace safety assessment document under Indian law that identifies and addresses office-related risks and hazards while ensuring regulatory compliance.

find out more

Window Cleaning Risk Assessment

An Indian jurisdiction-compliant risk assessment document for window cleaning operations, detailing safety protocols and hazard mitigation strategies.

find out more

Food Risk Assessment

A technical assessment document identifying food safety hazards and control measures in compliance with Indian FSSAI regulations and food safety standards.

find out more

Occupational Therapy Risk Assessment

An Indian regulation-compliant occupational therapy risk assessment document for evaluating and documenting potential hazards and therapeutic adaptations in various environments.

find out more

Psychology Risk Assessment

A legally compliant psychological risk evaluation document used in India for assessing and managing mental health risks.

find out more

Food Defence Risk Assessment

A comprehensive food defence risk assessment document compliant with Indian FSSAI regulations, evaluating and establishing protocols to prevent intentional food contamination.

find out more

Food Fraud Vulnerability Assessment

A comprehensive food fraud vulnerability assessment framework compliant with Indian FSSAI requirements and international standards.

find out more

Workplace Violence Risk Assessment

A systematic evaluation of workplace violence risks and mitigation strategies, compliant with Indian safety regulations and labor laws.

find out more

Warehouse Risk Assessment

A detailed risk assessment document for warehouse operations in India, evaluating safety, compliance, and operational hazards while providing mitigation recommendations.

find out more

Third Party Risk Assessment

A regulatory-compliant framework for assessing third-party risks in India, incorporating local legal requirements and international risk management standards.

find out more

Travel Risk Assessment

An India-compliant risk assessment document analyzing travel-related risks and providing mitigation strategies under Indian law.

find out more

Stress Risk Assessment

A legally compliant workplace stress risk assessment document adhering to Indian labor laws and safety regulations, designed to identify and mitigate psychological hazards in the workplace.

find out more

Step Ladder Risk Assessment

An Indian workplace safety document for assessing and controlling risks associated with step ladder use, compliant with national safety regulations.

find out more

Shop Risk Assessment

A mandatory safety evaluation document for retail establishments in India, assessing workplace hazards and risk control measures in compliance with national and state safety regulations.

find out more

Risk Assessment Form

A structured document for identifying and managing workplace risks and hazards, compliant with Indian safety regulations and standards.

find out more

Risk Assessment And Method Statement

A comprehensive safety management document combining risk assessment and work procedures, designed to comply with Indian safety regulations and labor laws.

find out more

Pregnancy Risk Assessment

A workplace risk assessment document for pregnant employees in India, ensuring compliance with maternal safety regulations and labor laws.

find out more

Pest Risk Assessment

A regulatory document under Indian law that assesses potential risks associated with pest species and recommends appropriate management strategies.

find out more

Infection Control Risk Assessment

A comprehensive infection control risk assessment framework for healthcare facilities in India, aligned with NABH standards and national healthcare regulations.

find out more

Legal Risk Assessment

A comprehensive legal risk evaluation and mitigation strategy document prepared under Indian law, analyzing potential legal exposures and compliance requirements.

find out more

Functional Risk Assessment

A comprehensive operational risk evaluation document compliant with Indian safety and workplace regulations, designed to identify and mitigate organizational risks.

find out more

Forklift Risk Assessment

A regulatory-compliant risk assessment document for forklift operations under Indian law, identifying hazards and establishing safety protocols.

find out more

Food Safety Risk Assessment

A systematic evaluation of food safety hazards and risks compliant with Indian FSSAI regulations and food safety standards.

find out more

First Aid Risk Assessment

A mandatory workplace safety document under Indian regulations that assesses first aid requirements and emergency response procedures based on workplace-specific risks.

find out more

Finance Risk Assessment

A comprehensive financial risk evaluation document compliant with Indian regulatory requirements and RBI/SEBI guidelines.

find out more

Exposure Assessment

A technical document compliant with Indian regulations that evaluates and documents workplace exposure risks, providing analysis and control recommendations.

find out more

Anti Bribery And Corruption Risk Assessment

A comprehensive anti-bribery and corruption risk assessment document aligned with Indian regulatory requirements and international standards.

find out more

Client Risk Assessment Form

An Indian regulatory-compliant form for assessing and documenting client risk profiles in financial institutions, aligned with RBI and SEBI guidelines.

find out more

Epilepsy Risk Assessment Form

An Indian-compliant medical form for assessing and documenting epilepsy-related risks, safety protocols, and management strategies.

find out more

Young Person Risk Assessment Form

An Indian jurisdiction risk assessment form for evaluating and documenting potential risks to young persons (under 18) in various activities and work environments.

find out more

Automatic Gate Risk Assessment Form

An Indian-compliant risk assessment form for evaluating safety and operational aspects of automatic gate systems under Indian safety regulations.

find out more

Life Safety Risk Assessment Form

A comprehensive safety evaluation document used in India to assess and document life safety risks in facilities, ensuring compliance with national and state safety regulations.

find out more

Vendor Risk Assessment Form

A comprehensive vendor risk assessment tool compliant with Indian regulations for evaluating supplier-related risks across multiple dimensions.

find out more

Risk Assessment And Control Form

A legally compliant document under Indian law for identifying, assessing, and controlling workplace hazards and risks.

find out more

Respiratory Hazard Assessment Form

An Indian regulatory-compliant assessment form for evaluating and controlling workplace respiratory hazards under the Factories Act framework.

find out more

Workplace Hazard Assessment Form

A mandatory workplace safety assessment document under Indian law for identifying and managing workplace hazards, aligned with the OSH Code 2020.

find out more

Pre Task Risk Assessment Form

A standardized form used in Indian workplaces for identifying and assessing task-specific risks and establishing necessary safety measures before work commencement.

find out more

Biological Risk Assessment Form

An Indian regulatory-compliant form for assessing and documenting biological hazards and risks in laboratory and research settings, including control measures and safety protocols.

find out more

Fire Risk Assessment Form

An Indian regulation-compliant fire risk assessment document for evaluating and documenting fire safety measures, hazards, and improvement requirements in properties.

find out more

Ppe Hazard Assessment Certification Form

An Indian regulatory compliance document for certifying workplace hazard assessments and corresponding PPE requirements under Indian safety regulations.

find out more

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it