Slab Coring Method Statement for Australia
Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Slab Coring Method Statement
"I need a Slab Coring Method Statement for a hospital renovation project in Sydney, where we'll be coring through post-tensioned concrete floors to install new medical gas services in March 2025, with particular emphasis on infection control and minimal disruption to hospital operations."
Your data doesn't train Genie's AI
You keep IP ownership of your information
1. 1. Project Information: Details of the project, location, client, and scope of coring works
2. 2. Purpose and Scope: Objectives of the coring work and extent of activities covered by the method statement
3. 3. References and Standards: List of applicable Australian Standards, codes, and regulations
4. 4. Definitions: Definition of technical terms and abbreviations used in the document
5. 5. Responsibilities: Roles and responsibilities of key personnel involved in the coring operation
6. 6. Risk Assessment: Identification of hazards and control measures specific to slab coring operations
7. 7. Equipment and Materials: List of required tools, equipment, and materials including specifications
8. 8. Pre-coring Requirements: Site preparation, services identification, and preliminary checks
9. 9. Methodology: Step-by-step procedure for conducting the slab coring operation
10. 10. Safety Requirements: Specific safety measures, PPE requirements, and emergency procedures
11. 11. Environmental Controls: Measures for dust, noise, and slurry management
12. 12. Quality Control: Inspection and testing requirements, acceptance criteria
13. 13. Documentation: Records to be maintained during the coring operation
1. Structural Engineering Assessment: Required when coring may affect structural integrity of the slab
2. Traffic Management Plan: Needed when coring operations affect vehicle or pedestrian access
3. Noise Management Plan: Required for noise-sensitive areas or after-hours work
4. Temporary Works: Include when temporary support structures are needed
5. Concrete Reinstatement Method: Required when holes need to be patched after coring
6. Underground Services Protection: Include when working near sensitive underground services
7. Stakeholder Communication Plan: Required for works affecting multiple parties or public areas
1. Schedule A - Risk Assessment Matrix: Detailed risk assessment table with control measures
2. Schedule B - Equipment Specifications: Technical specifications of core drilling equipment
3. Schedule C - Site Plans: Marked-up drawings showing coring locations and services
4. Schedule D - Inspection Forms: Quality control and inspection checklists
5. Schedule E - Emergency Response Plan: Emergency procedures and contact information
6. Appendix 1 - Safe Work Method Statement: Detailed SWMS for the coring operation
7. Appendix 2 - Training Records: Certificates and competencies of personnel
8. Appendix 3 - Equipment Certificates: Calibration and maintenance records for equipment
Authors
Construction
Infrastructure
Commercial Property
Industrial
Mining
Residential Development
Education
Healthcare
Retail
Government
Utilities
Transport
Operations
Health and Safety
Quality Assurance
Engineering
Construction
Compliance
Risk Management
Project Management
Environmental
Facilities Management
Technical Services
Construction Manager
Project Engineer
Site Supervisor
Safety Manager
Quality Control Inspector
Concrete Cutting Operator
Structural Engineer
Construction Supervisor
WHS Coordinator
Environmental Compliance Officer
Building Inspector
Facilities Manager
Project Director
Risk Assessment Officer
Construction Foreman
Find the exact document you need
Slab Coring Method Statement
An Australian-compliant technical document outlining safe methodology and procedures for concrete slab coring operations, aligned with local WHS regulations and construction standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it